Precast Services Inc.
8200 Boyle Parkway
Twinsburg OH 44087
Ph: 330.425.2880
Fx: 330.963.0150
Contact: Charles Mayer
Web site: http://www.precastservices.com
Founded in 1988 by Charles Mayer, CEO; Barry Cooper, president, and James Mirgliotta, Precast Services Inc. specializes in the erection of architectural and structural precast concrete sections for parking structures, building facades, and sports arenas. The company is certified by the Precast/Prestressed Concrete Institute (PCI) as a qualified erector under the institute's field qualification program. Precast Services Inc. has completed such complex projects as the 12-story Trump Taj Mahal parking facility in Atlantic City, N.J., which required the installation of 15 ft. x 60 ft. double tee panels weighing more than 37 tons each. Other notable projects include the 260-ft. tall air traffic control tower at Detroit Wayne County Metropolitan Airport, and the parking structure at the MGM Grand's temporary casino in Detroit. In addition to Mayer and Cooper, other officers are: Jonathan Smith, executive vice president, and Glen Winterfield, vice president/field operations.
Back to Member Profile List
Who We Are ||
Join ||
News & Events
Member Area ||
Industry Links
Calendar ||
Contact ||
Home
©2006 Great Lakes Fabricators & Erectors Association. All Rights Reserved.
|